English
  • English
  • Español
  • عربي
  • Русский
Product Detail
Technical Parameters
Video

Description

This series of Mixing / Preparation Tank has a reasonable design, the tank body adopts a single or triple-layer structure, liner polishing Ra 0.45, external uses mirror panels or matte board to keep insulation, interlayer twine spiral-band, connects with steam heating or cold water and filing insulation material, there are intake, feed port, the return flow port, disinfection port, cleaning ball, manhole located at the top of tank, and also install air breathing apparatus and 0.22 um mixing system. There is an outlet, sewage outlet, sampling port, temperature probe, and liquid level sensor located at the bottom of the tank. The operation control cabinet can be equipped to detect liquid temperature and show, a high-level temperature control and display, to provide upper and lower limit alarm functions.

 

Description

This series of Mixing / Preparation Tank has a reasonable design, the tank body adopts a single or triple-layer structure, liner polishing Ra 0.45, external uses mirror panels or matte board to keep insulation, interlayer twine spiral-band, connects with steam heating or cold water and filing insulation material, there are intake, feed port, the return flow port, disinfection port, cleaning ball, manhole located at the top of tank, and also install air breathing apparatus and 0.22 um mixing system. There is an outlet, sewage outlet, sampling port, temperature probe, and liquid level sensor located at the bottom of the tank. The operation control cabinet can be equipped to detect liquid temperature and show, a high-level temperature control and display, to provide upper and lower limit alarm functions.

 


GOT FREE INQUIRY NOW
If there is anything you're not sure about or you just need a hand getting set-up you can call or email us.
* Name
Phone
* Email
Company
* Message